Nine questions to ask a builder before you sign

CK's Construction

Most building jobs that go wrong were already going wrong at the signing table. Not because anybody lied, but because nobody asked, and two people walked away from the same conversation believing two different things.

Here are the nine questions worth asking every builder you talk to, ours included. None of them are trick questions. What matters is not the answer so much as whether you get a straight one.

1. What is not in this price?

Every bid leaves something out. That is not dishonest — it is how bids work. The dishonest part is leaving you to find out in month three.

Ask it in exactly those words, and listen for specifics. Concrete? Site prep and dirt work? Electric, plumbing, HVAC? Gutters? The pad? Getting power to the building? A builder who has done this before will rattle off a list without having to think about it.

2. Is this a bare shell or a finished building?

For barns, shops and garages this is the biggest single reason two bids come back thousands apart. One man priced you a building. The other priced you a building you can work in — insulated, wired, lit, heated, with a concrete floor.

Both are legitimate. They are not the same product, and comparing their prices is meaningless until you know which one you are looking at.

3. What happens when something changes?

Something always changes. Ask how a change gets priced and who has to say yes before it happens.

The answer you want is that it gets written down and you approve it before anybody starts. The answer you do not want is a shrug and “we’ll sort it out at the end.”

4. Can I see something you built three or four years ago?

Anybody can show you a photograph taken the week a job finished. What you want to know is what it looks like after four winters — whether the trim still sits flat, whether the doors still shut square, whether the metal has held its color.

Most customers are happy to let somebody drive past and look. If a builder cannot produce a single older job in your part of the country, that tells you something on its own.

5. Are you insured, and can I have the certificate?

Not “are you insured” — the certificate. Every real builder can produce one in about a minute, because he is asked for it constantly. It should be current, and the name on it should be the same name as the one on your contract.

If somebody working on your property is not covered, the exposure can end up being yours. This is a two-minute question that is worth more than it sounds.

6. Who is actually going to be here, and who do I ring?

You want one name and one number — the person who knows what is happening on your job on any given day. Not a switchboard, and not a different answer every week.

Ask what happens when you ring and he is up a roof. There should be an answer.

7. When do you start, and what would stop you finishing?

Any builder can name a start date. Ask the second half of the question instead, because that is the one that gets an honest answer: what would hold this up?

Weather, materials on backorder, an inspection, the concrete crew, the ground being too wet to get a truck in. A man who says nothing would hold it up has either never built anything or is telling you what you want to hear.

8. How do payments work?

You want to know the deposit, the stages, and what triggers each one. Payments tied to work actually completed are normal and fair. A large sum up front with nothing on the ground yet is worth asking hard about.

Get it in writing, in the contract, not in a text message.

9. What would you do if this were yours?

Ask it at the end, once he has seen the site and understood what you want. It is the question that tells you whether you are talking to somebody who is thinking about your building or somebody who is thinking about his invoice.

The best answer you can get is a builder talking you out of something — telling you a smaller building does the job, or that you do not need him for this at all. A man willing to lose the sale is a man you can believe on everything else.

One more thing

Ask all nine of every builder you talk to, and ask them the same way. The point is not to catch anybody out. It is that when you put the same nine questions to three men, the differences between them stop being about price and start being about who is going to finish your building properly.

If you want to try them on us, ring and do it. We would rather answer nine questions now than have a misunderstanding in November.

Next step

Tell Us About Your Project!

We understand that investing in a build is a big decision. We offer a complimentary consultation where we will gather the scope of your project, ideal timeline, and budget.