Why choose CK's Construction?

CK's Construction

Every builder’s website says the same four things. Quality workmanship. Honest communication. Attention to detail. Family values. You cannot tell one company from another by reading them, and you certainly cannot hold anybody to them.

So here is the version with something underneath it. The values below are not marketing copy somebody wrote for us - they are the five things Carl Kramer started this company on, in his own words, and they were written down before there was a website to put them on. After them is the part that matters more: the paperwork you actually get, what it commits us to, and the things we will say to you that other people will not.

What we are here to do

You dream it, we build it.

Mainly beautiful houses and customized barns - foundation to finish, or just certain components of the building process. If you want us for the whole thing, good. If you have a material package and need a crew that can frame and skin a building without two weeks of standing around, that is work we do every week too.

CK’s Construction was started in 2018 by Carl Kramer, after nearly a decade in the trade.

The five things we hold ourselves to

These are the reason there is a CK’s Construction at all. Carl’s words:

  1. We operate with a standard of excellence.
  2. We do the right thing every time.
  3. We value and recognize our people.
  4. We think and act with optimism and faith.
  5. We are constantly innovating and improving.

Read them again and notice what is missing. Nothing about being the cheapest - though we work hard at keeping our pricing honest. Nothing about being the fastest - though we work our tails off to get your job done. “The right thing every time” is a harder promise than either of those, because it is the one that costs us money on the day we keep it.

What those words have to survive contact with

A value is only worth the sentence it is written in if it still holds when it is inconvenient. Here is where ours get tested, and what we do.

When the honest answer loses us the job

The most useful thing a builder can do is make sure you understand what you are actually asking for. A 30x50 done right beats a 40x60 built to a number. A roof with four bad details does not need replacing; it needs the four details fixed. A man willing to lose a sale is the only one you can believe when he tells you what you do need.

We would rather give you the right recommendation and be the people you call in four years than sell you the bigger one once.

When something is wrong and nobody has noticed

Doing the right thing every time is cheap when somebody is watching. It is expensive when the mistake is buried, the inspection has passed, and saying nothing would cost us nothing. That is the only version of the value that counts, so we do not wait to be asked. If we have got something wrong, you hear it from us - what it is, and what we are doing to put it right - before you have to go looking for it. You should never learn about a mistake on your own building from anybody but us.

When the price moves

Prices move. Steel moves, lumber moves, concrete moves. Your price does not. If we bid the job wrong, that is ours to eat, and we eat it - we do not come back afterwards asking you to cover our math. The only thing that changes your number is work you have asked for that was never in the scope, and that goes through a change order you see and agree to before it is built. Once the invoice is out, the number on it is the number.

The paperwork, and what it actually commits us to

This is the part you can hold us to, because it is in writing on every job.

Every estimate is read by Carl before it reaches you. Every job, without exception - not just the complicated ones.

A proposal is good for thirty days. It says so on the proposal. After thirty days the numbers behind it are no longer the numbers, so rather than quietly honor a stale price or quietly raise it, we close it and write you a new one with current figures. If you come back to us in three months, you get a real quote, not an argument about an old piece of paper.

The payment schedule is laid out before you sign. Typically ten percent down, forty percent at the start of the job, and the balance at completion. On larger jobs it splits further, or bills by phase. Two things worth knowing plainly: you never pay the bulk of it before there is a building on the ground, and that ten percent deposit is not refundable if you cancel after paying it.

Our workmanship is warranted for three years. Materials carry whatever their own manufacturer’s warranty is - a forty-year panel is a forty-year panel - and that is a separate thing from our labor.

You pull and pay for the permits; we give you whatever the office needs. Sizes, drawings, setbacks, whatever the county asks for. We do not take the permit out in our name, and we do not leave you to work out what they want either.

Our general liability insurance is current, and you may see the certificate. Ask. Anybody who hesitates on that question has told you something.

Invoices are due on receipt, because we have bills of our own to pay once the work is finished. Check or bank transfer, whichever suits you.

On price, said plainly

We quote a price, not a guess dressed as one. If you want to know how a number like that is built up - what the slab costs, what the doors cost, what moves a pole barn from a shell to a finished building - we wrote a long article showing the actual line items rather than asking you to take our word for it.

What we will not do is give you a price for your building over the phone before anybody has seen the ground. Ground is the single biggest thing that moves a foundation number, and no honest figure exists before somebody has stood on it.

How long yours will take

The honest answer is that it depends on the job, and that anybody who gives you a date before seeing it is guessing. What we can tell you is that the building is rarely the slow part. Decisions are. Finishes chosen late, a special-order window, an inspection that cannot be scheduled for two weeks - those are what move a finish date, far more often than framing does.

Ask us for the stage-by-stage on your job when we quote it, and ask what you have to decide and by when. If you do that on the front end, most of what goes wrong with schedules never gets started.

Where we work

Roughly 120 miles out of Jamesport, Missouri - most of north Missouri, down through the north side of Kansas City, and over into north-east Kansas. Every finished job on this website says what town it is in and what it is made of, and gives the size where a size means anything, so you can judge the work rather than the words about it.

If one of them is near you, ask and we will point you at it. Most of our customers are happy to have their building looked at.

Before you choose anybody

Whoever you end up using - us or somebody else - there are nine questions worth putting to every builder you talk to, and worth putting the same way to each of them. We wrote them out here, including the ones that are awkward for us.

Put the same nine to three builders and the differences between them stop being about price and start being about who is going to finish your building properly. That is the comparison worth making, and we would rather you made it than took our word for anything on this page.

Next step

Tell Us About Your Project!

We understand that investing in a build is a big decision. We offer a complimentary consultation where we will gather the scope of your project, ideal timeline, and budget.